Water Supply Issues

Sr No. Scheme Code Scheme Name OHT Code District Block Panchayat Village Code Village Issue Type Issue Date Expected Issue Resolve Date Remark
1 20015168 PARSPUR SCHEME 20015168/01 Ghazipur Jakhania Parspur 471555 Parspur Road Widening 18-Mar-2026 The scheme was under operation and maintenance (O&M), and regular water supply was functioning smoothly up to 17-03-2026. However, on 18-03-2026, the HDPE pipeline of 63 mm diameter (78 Rmt) and 110 mm diameter (48 Rmt) was damaged by the PWD department during road construction work.As a result, 35 Nos. of FHTCs were damaged, along with 96 Rmt of MDPE pipeline. Due to this damage, we are currently unable to resume regular water supply. If the supply is started, water flows onto the road because of the damaged pipelines.
2 20100572 BARAI PARA W/S SCHEME 20100572/01 Ghazipur Manihari Barai Para 471745 Barai Para Road Widening 19-Mar-2026 The scheme was under trial run phase, and regular water supply was functioning smoothly up to 18-03-2026. However, on 19-03-2026, the HDPE pipeline of 63 mm diameter (368 Rmt) was damaged by the PWD department during drainage construction work on both sides of the road. As a result, 56 Nos. of FHTCs were damaged, along with 215 Rmt of MDPE pipeline. Due to this damage, we are currently unable to resume regular water supply. If the supply is started, water flows onto the road due to the damaged pipelines.