Project Completion Certificate (Ground Water)
Scheme ID: 20011317 Name of Scheme: BARAYLA TIGAWAN No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2750 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 16-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23M/ 61.82M BARAYLA TIGAWAN 27.416957 80.008956
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.62 M³ per Min /45Mtr BARAYLA TIGAWAN 27.416957 80.008956
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/ 14Mtr BARAYLA TIGAWAN 27.416961 80.009082
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0191
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.8528
2 HDPE Pipe PN-6, Class PE-100 75 1.2486
3 HDPE Pipe PN-6, Class PE-100 90 0.3848
4 HDPE Pipe PN-6, Class PE-100 110 3.1225
5 HDPE Pipe PN-6, Class PE-100 160 1.3409
HSC Connection
Sno. Total Nos.
1 351
Other Details
2.31
0.00
2.27
15-Nov-2023
24-Dec-2024