| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011873 | Name of Scheme: Birauri | No. of Villages: 1 | No. of Habitation Covered: 8 |
| Total Population Covered: 6060 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 14-Jun-2023 | Actual Date of Completion (Capex): 06-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.03M/ 124.77M | Birauri | 27.154249 | 80.097663 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1.400 M³ per Min /45Mtr | Birauri | 27.154249 | 80.097663 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 400KL/ 16Mtr | Birauri | 27.154033 | 80.098666 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D. I. Pipe | 200 | 0.0234 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 6.3452 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 4.3526 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 3.3152 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 1.9068 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 125 | 0.8004 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 140 | 0.0722 | |
| 7 | HDPE Pipe PN-6, Class PE-100 | 160 | 0.5089 | |
| 8 | HDPE Pipe PN-6, Class PE-100 | 200 | 0.9021 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 866 |