| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012433 | Name of Scheme: Sardapur | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2530 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2023 | Actual Date of Completion (Capex): 20-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 22.01M/ 95.87M | Sardapur | 27.384794 | 80.321282 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.6 M³ per Min /43Mtr | Sardapur | 27.384794 | 80.321282 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL/ 12Mtr | Sardapur | 27.384683 | 80.321305 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D. I. Pipe | 150 | 0.02131 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 4.7401 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 3.7826 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 0.6167 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 4.022 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 140 | 0.241 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 160 | 0.047 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 331 |