Project Completion Certificate (Ground Water)
Scheme ID: 20012499 Name of Scheme: BHAATAULY NANDAULY No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 5920 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 10-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 17M/ 98.8M BHAATAULY NANDAULY 27.010082 80.366145
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.300 M³ per Min /45Mtr BHAATAULY NANDAULY 27.010082 80.366145
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400KL/ 20Mtr BHAATAULY NANDAULY 27.010191 80.366053
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.01847
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.5404
2 HDPE Pipe PN-6, Class PE-100 75 5.1596
3 HDPE Pipe PN-6, Class PE-100 90 4.785
4 HDPE Pipe PN-6, Class PE-100 110 2.9715
5 HDPE Pipe PN-6, Class PE-100 125 0.1763
6 HDPE Pipe PN-6, Class PE-100 140 0.614
7 HDPE Pipe PN-6, Class PE-100 160 1.166
8 HDPE Pipe PN-6, Class PE-100 200 0.573
HSC Connection
Sno. Total Nos.
1 1054
Other Details
4.28
0.00
4.17
09-Jul-2023
24-Dec-2024