Project Completion Certificate (Ground Water)
Scheme ID: 20012664 Name of Scheme: Reewan No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2185 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 18/127.13 REEWAN 26.438562 79.619388
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 52/54 REEWAN 26.438562 79.619388
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 REEWAN 26.438562 79.619388
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.365
2 HDPE 75 1.224
3 HDPE 90 1.144
4 HDPE 110 0.620
5 HDPE 140 0.719
6 HDPE 160 1.055
HSC Connection
Sno. Total Nos.
1 390
Other Details
2.67
2.01
2.01
31-Oct-2023
01-Nov-2023