Project Completion Certificate (Ground Water)
Scheme ID: 20012953 Name of Scheme: Sehara No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 4156 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-May-2023 Actual Date of Completion (Capex): 22-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well -300X200 42.05/91.25 Sehara 25.486611 82.540757
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Pump-17.5HP 900/46.80 Sehara 25.486611 82.540757
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300/12 Sehara 25.486159 82.540458
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 200 0.0155
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 200 0.129
2 HDPE PIPE PN-6 160 0.440
3 HDPE PIPE PN-6 140 0.574
4 HDPE PIPE PN-6 110 0.759
5 HDPE PIPE PN-6 90 0.958
6 HDPE PIPE PN-6 75 0.943
7 HDPE PIPE PN-6 63 7.098
HSC Connection
Sno. Total Nos.
1 340
Other Details
2.73
2.60
2.23
21-Mar-2026
22-Mar-2026