Project Completion Certificate (Ground Water)
Scheme ID: 20015553 Name of Scheme: Bilandpur gaddipur No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3310 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26.07/102.24 BILANDPUR GADDIPUR 28.040297 79.945515
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 41.76/43 BILANDPUR GADDIPUR 28.040297 79.945515
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 200/12 BILANDPUR GADDIPUR 28.040232 79.945531
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 6.405
2 HDPE/6KG 75 0.670
3 HDPE/6KG 90 1.056
4 HDPE/6KG 110 0.671
5 HDPE/6KG 140 0.869
6 HDPE/6KG 160 0.045
HSC Connection
Sno. Total Nos.
1 568
Other Details
2.19
0.00
2.19
30-Dec-2023
06-Dec-2024