Project Completion Certificate (Ground Water)
Scheme ID: 20021187 Name of Scheme: PADRI No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 4795 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 11-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.03M/ 110.91M PADRI 27.494387 80.244852
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.100 M³ per Min /45Mtr PADRI 27.494387 80.244852
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350KL/ 16Mtr PADRI 27.487705 80.247988
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02292
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.4701
2 HDPE Pipe PN-6, Class PE-100 75 4.0588
3 HDPE Pipe PN-6, Class PE-100 90 5.319
4 HDPE Pipe PN-6, Class PE-100 110 0.988
5 HDPE Pipe PN-6, Class PE-100 125 0.625
6 HDPE Pipe PN-6, Class PE-100 140 0.006
7 HDPE Pipe PN-6, Class PE-100 200 1.826
HSC Connection
Sno. Total Nos.
1 699
Other Details
4.96
0.00
4.60
10-Jul-2023
24-Dec-2024