Project Completion Certificate (Ground Water)
Scheme ID: 20024872 Name of Scheme: Gardeurn No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 3656 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 10-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.04M/ 113.74M Gardeurn 27.311211 80.270985
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.300 M³ per Min /45Mtr Gardeurn 27.311211 80.270985
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400KL/ 20Mtr Gardeurn 27.306093 80.26541
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02556
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.1377
2 HDPE Pipe PN-6, Class PE-100 75 5.0895
3 HDPE Pipe PN-6, Class PE-100 90 2.3237
4 HDPE Pipe PN-6, Class PE-100 110 3.5976
5 HDPE Pipe PN-6, Class PE-100 125 1.2028
6 HDPE Pipe PN-6, Class PE-100 140 1.2945
7 HDPE Pipe PN-6, Class PE-100 160 1.149
8 HDPE Pipe PN-6, Class PE-100 180 0.502
9 HDPE Pipe PN-6, Class PE-100 200 0.060
HSC Connection
Sno. Total Nos.
1 913
Other Details
5.50
0.00
5.24
09-Apr-2023
24-Dec-2024