Scheme ID: 20025505 Name of Scheme: Biriya Derapur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2235 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Aug-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24.04/168.95 Biriya Derapur 26.414391' 79.810283'
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 33.30/59 Biriya Derapur 26.414391 79.810283
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Biriya Derapur 26.414391 79.810283
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 .022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.82
2 HDPE 75 .0598
3 HDPE 90 1.172
4 HDPE 110 .456
5 HDPE 140 1.294
6 HDPE 160 .390
7 HDPE 180 0.819
HSC Connection
Sno. Total Nos.
1 432
Other Details
1.58
2.00
2.00
28-Feb-2024
01-Mar-2024