Project Completion Certificate (Ground Water)
Scheme ID: 20033795 Name of Scheme: CHITWAI water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 2620 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 20-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 105.83/24.04 CHITWAI 26.57776518 82.52034016
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 12.5 HP 0.55/45.00 CHITWAI 26.57776518 82.52034016
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 150 KL /14 M CHITWAI 26.57776518 82.52034016
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6;Class PE-100 90 0.652
2 HDPE PIPE PN-6;Class PE-100 75 2.159
3 HDPE PIPE PN-6;Class PE-100 63 10.517
4 HDPE PIPE PN-6;Class PE-100 110 0.888
5 HDPE PIPE PN-6;Class PE-100 125 0.653
HSC Connection
Sno. Total Nos.
1 494
Other Details
2.18
2.18
2.24
30-Mar-2026
31-Mar-2026