Project Completion Certificate (Ground Water)
Scheme ID: 20034383 Name of Scheme: DUHIYA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3110 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Oct-2023 Actual Date of Completion (Capex): 24-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 24.07/125.37 DUHIYA 26.530642 82.706783
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 15 HP 0.65/47.00 DUHIYA 26.530642 82.706783
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 175 Kl 16 M DUHIYA 26.530642 82.706783
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.02
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6;Class PE-100 90 0.506
2 HDPE PIPE PN-6;Class PE-100 75 0.845
3 HDPE PIPE PN-6;Class PE-100 63 8.478
4 HDPE PIPE PN-6;Class PE-100 125 0.363
5 HDPE PIPE PN-6;Class PE-100 140 0.504
6 HDPE PIPE PN-6;Class PE-100 160 0.843
7 HDPE PIPE PN-6;Class PE-100 200 0.986
HSC Connection
Sno. Total Nos.
1 465
Other Details
2.30
2.30
2.29
25-Mar-2026
26-Mar-2026