Project Completion Certificate (Ground Water)
Scheme ID: 20050755 Name of Scheme: Itaili No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 3660 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.08/143.22 Itaili 26.659619 79.899683
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 62.1/60 Itaili 26.659619 79.899683
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/15 Itaili 26.659619 79.899683
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.3
2 HDPE 75 0.95
3 HDPE 90 0.36
4 HDPE 110 2.7
5 HDPE 140 1.6
6 HDPE 160 1.37
7 HDPE 180 0.5
HSC Connection
Sno. Total Nos.
1 560
Other Details
2.40
2.78
2.78
31-Mar-2024
01-Apr-2024