Project Completion Certificate (Ground Water)
Scheme ID: 20053151 Name of Scheme: HARIYANA & BAKSHANPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 5318 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 26-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 36.07 / 114.74 Haryana 29.237383 78.517135
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 1200 / 53 Haryana 29.237383 78.517135
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 / 16 Haryana 29.237383 78.517135
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 14.0828
2 HDPE 75 0.7625
3 HDPE 90 0.6538
4 HDPE 110 0.5916
5 HDPE 125 0.2374
6 HDPE 140 0.2683
7 HDPE 160 0.154
8 DI K7 200 1.353
HSC Connection
Sno. Total Nos.
1 810
Other Details
4.37
0.00
4.34
26-Apr-2025
27-Apr-2025