Project Completion Certificate (Ground Water)
Scheme ID: 20056213 Name of Scheme: BENIPUR WSS No. of Villages: 4 No. of Habitation Covered: 10
Total Population Covered: 4330 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 14-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 27.01/65.63 BENIPUR 26º 26' 23.93" N 82º 25' 8.27" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 45/44 BENIPUR 26º 26' 23.93" N 82º 25' 8.27" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 23.498
2 HDPE Pipe PN-6: Class PE-100 75 1.306
3 HDPE Pipe PN-6: Class PE-100 90 0.880
4 HDPE Pipe PN-6: Class PE-100 110 0.858
5 HDPE Pipe PN-6: Class PE-100 125 1.223
6 HDPE Pipe PN-6: Class PE-100 140 0.263
7 HDPE Pipe PN-6: Class PE-100 160 0.435
HSC Connection
Sno. Total Nos.
Other Details
2.78
0.00
0.00
31-Jan-2026
01-Feb-2026