| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056817 | Name of Scheme: KHALISPUR KHURD VILLAGE WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3492 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Jan-2024 | Actual Date of Completion (Capex): 12-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200X150 | 18.13 m/251.87 m | Khalishpur Khurd | 25.623181 | 82.819162 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10 HP | 500LPM/44M | Khalishpur Khurd | 25.623181 | 82.819162 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL/12M | Khalishpur Khurd | 25.5622972 | 82.819087 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI,K-7 | 100 | 0.03525 | YES |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.392 | YES |
| 2 | HDPE | 75 | 2.435 | YES |
| 3 | HDPE | 63 | 6.944 | YES |
| 4 | HDPE | 125 | .426 | YES |
| 5 | HDPE | 140 | .255 | YES |
| 6 | HDPE | 160 | .307 | YES |
| 7 | HDPE | 180 | .323 | YES |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 333 |