Scheme ID: 20059179 Name of Scheme: TURTEEPUR JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4480 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Feb-2024 Actual Date of Completion (Capex): 07-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21M/ 128.3M TURTEEPUR 27.271253 80.101772
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.92 M³ per Min /43Mtr TURTEEPUR 27.271253 80.101772
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275KL/ 14Mtr TURTEEPUR 27.2712 80.101683
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.01591
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.100
2 HDPE Pipe PN-6, Class PE-100 75 2.599
3 HDPE Pipe PN-6, Class PE-100 90 2.489
4 HDPE Pipe PN-6, Class PE-100 100 5.661
5 HDPE Pipe PN-6, Class PE-100 125 0.067
6 HDPE Pipe PN-6, Class PE-100 140 0.208
7 HDPE Pipe PN-6, Class PE-100 160 0.300
8 HDPE Pipe PN-6, Class PE-100 200 0.320
HSC Connection
Sno. Total Nos.
1 417
Other Details
3.31
0.00
3.28
06-Jan-2024