| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20059705 | Name of Scheme: BARAIYA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 14 |
| Total Population Covered: 3370 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Jan-2024 | Actual Date of Completion (Capex): 27-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 6m/63m | BARAIYA | 25.959258 | 82.41225 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10HP | 660LPM/43m | BARAIYA | 25.959258 | 82.41225 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175KL/12m | BARAIYA | 25.959468 | 82.412232 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.0196 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 4.179 | Yes |
| 2 | HDPE | 75 | 5.726 | Yes |
| 3 | HDPE | 63 | 12.673 | Yes |
| 4 | HDPE | 110 | 0.903 | Yes |
| 5 | HDPE | 140 | 0.266 | Yes |
| 6 | HDPE | 160 | 0.118 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 293 |