Project Completion Certificate (Ground Water)
Scheme ID: 20061217 Name of Scheme: NAIKPUR HATIMPUR (GOGP) No. of Villages: 4 No. of Habitation Covered: 5
Total Population Covered: 4170 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Feb-2024 Actual Date of Completion (Capex): 09-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24M/ 122.3M NAIKPUR HATIMPUR 27.253569 79.966624
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.88 M³ per Min /45Mtr NAIKPUR HATIMPUR 27.253569 79.966624
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275KL/ 16Mtr NAIKPUR HATIMPUR 27.253522 79.966411
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.01834
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.389
2 HDPE Pipe PN-6, Class PE-100 75 2.347
3 HDPE Pipe PN-6, Class PE-100 90 1.650
4 HDPE Pipe PN-6, Class PE-100 140 1.296
5 HDPE Pipe PN-6, Class PE-100 160 2.617
6 HDPE Pipe PN-6, Class PE-100 180 1.398
7 HDPE Pipe PN-6, Class PE-100 200 0.171
HSC Connection
Sno. Total Nos.
1 688
Other Details
3.19
0.00
3.18
08-Sep-2024
26-Sep-2025