Project Completion Certificate (Ground Water)
Scheme ID: 20065078 Name of Scheme: NARAINI Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 19
Total Population Covered: 6063 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Jan-2024 Actual Date of Completion (Capex): 10-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL - 1 97.66/ 18.3 NARAINI 26.096191 81.733697
2 TUBEWELL - 2 95.66/ 16.7 NARAINI 26.099460 81.734160
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 650 LPM / 54 M NARAINI 26.096191 81.733697
2 SUBMERSIBLE - 2 650 LPM / 54 M NARAINI 26.099460 81.734160
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 375 KL / 16 M NARAINI 26.096191 81.733697
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.591
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 18.666
2 HDPE 90 5.695
3 HDPE 110 0.776
4 HDPE 140 1.343
5 HDPE 160 0.232
6 HDPE 180 1.139
7 HDPE 200 1.015
HSC Connection
Sno. Total Nos.
1 1000
Other Details
6.34
0.00
6.31
10-May-2025
11-Aug-2025