Project Completion Certificate (Ground Water)
Scheme ID: 20065213 Name of Scheme: RAI DAY PUR G.P WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3486 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Jan-2024 Actual Date of Completion (Capex): 20-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 62.61/16 RAI DAY PUR 26.134858 81.806856
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 700 LPM / 52 M RAI DAY PUR 26.134858 81.806856
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 200 KL / 14 M RAI DAY PUR 26.134858 81.806856
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.080
2 HDPE 90 4.346
3 HDPE 110 0.135
4 HDPE 125 0.569
5 HDPE 140 0.774
6 HDPE 160 0.200
HSC Connection
Sno. Total Nos.
1 566
Other Details
3.36
0.00
3.33
20-Nov-2024
22-Feb-2025