| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065213 | Name of Scheme: RAI DAY PUR G.P WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 3486 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 09-Jan-2024 | Actual Date of Completion (Capex): 20-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 62.61/16 | RAI DAY PUR | 26.134858 | 81.806856 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE - 1 | 700 LPM / 52 M | RAI DAY PUR | 26.134858 | 81.806856 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 200 KL / 14 M | RAI DAY PUR | 26.134858 | 81.806856 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.027 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.080 | |
| 2 | HDPE | 90 | 4.346 | |
| 3 | HDPE | 110 | 0.135 | |
| 4 | HDPE | 125 | 0.569 | |
| 5 | HDPE | 140 | 0.774 | |
| 6 | HDPE | 160 | 0.200 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 566 |