Project Completion Certificate (Ground Water)
Scheme ID: 20065435 Name of Scheme: SIRAICHMAU (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4890 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 15-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27M/ 110.3M SIRAICHMAU (GOGP) 27.212734 79.974248
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.014 M³ per Min /47Mtr SIRAICHMAU (GOGP) 27.212734 79.974248
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300KL/ 16Mtr SIRAICHMAU (GOGP) 27.212736 79.974266
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.01491
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.246
2 HDPE Pipe PN-6, Class PE-100 75 5.638
3 HDPE Pipe PN-6, Class PE-100 90 3.076
4 HDPE Pipe PN-6, Class PE-100 110 1.113
5 HDPE Pipe PN-6, Class PE-100 125 0.348
6 HDPE Pipe PN-6, Class PE-100 140 0.340
7 HDPE Pipe PN-6, Class PE-100 160 2.702
8 HDPE Pipe PN-6, Class PE-100 200 0.187
HSC Connection
Sno. Total Nos.
1 458
Other Details
3.81
0.00
3.29
14-Jan-2025
26-Sep-2025