| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066788 | Name of Scheme: KARDAHA VILLAGE WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 9 |
| Total Population Covered: 3070 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 27-Jan-2024 | Actual Date of Completion (Capex): 30-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 12m/71.09m | KARDAHA | 25.675191 | 82.858135 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5HP | 650LPM/44m | KARDAHA | 25.675191 | 82.858135 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200Kl/12m | KARDAHA | 25.675209 | 82.858032 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.0298 | Yes |
| 2 | DI K-7 | 200 | 0.0025 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.431 | Yes |
| 2 | HDPE | 75 | 2.961 | Yes |
| 3 | HDPE | 63 | 6.237 | Yes |
| 4 | HDPE | 110 | 1.029 | Yes |
| 5 | HDPE | 125 | 0.095 | Yes |
| 6 | HDPE | 140 | 0.263 | Yes |
| 7 | HDPE | 160 | 0.107 | Yes |
| 8 | HDPE | 180 | 0.058 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 402 |