Project Completion Certificate (Ground Water)
Scheme ID: 20067974 Name of Scheme: SHERPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2135 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2025 Actual Date of Completion (Capex): 01-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.009
2 K-7 DI PIPE 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 2.91
2 HDPE PIPE PN -6: CLASS PE -100 75 0.43
3 HDPE PIPE PN -6: CLASS PE -100 90 0.14
4 HDPE PIPE PN -6: CLASS PE -100 110 0.40
5 HDPE PIPE PN -6: CLASS PE -100 140 0.17
HSC Connection
Sno. Total Nos.
Other Details
1.67
1.67
1.52
31-Jan-2026
01-Feb-2026