| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20068014 | Name of Scheme: BANIYAPUR, LONIA PUR, RAIPUR PHUL WARI Water supply scheme | No. of Villages: 3 | No. of Habitation Covered: 22 |
| Total Population Covered: 6769 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Feb-2024 | Actual Date of Completion (Capex): 20-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL - 1 | 164.3/44.2 | BANIYAPUR, LONIA PUR, RAIPUR PHUL WARI | 26.143032 | 81.78286 |
| 2 | TUBEWELL - 2 | 157.97/44.22 | BANIYAPUR, LONIA PUR, RAIPUR PHUL WARI | 26.142220 | 81.788920 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE - 1 | 715 LPM / 58 M | BANIYAPUR, LONIA PUR, RAIPUR PHUL WARI | 26.143032 | 81.78286 |
| 2 | SUBMERSIBLE - 2 | 715 LPM / 58 M | BANIYAPUR, LONIA PUR, RAIPUR PHUL WARI | 26.142220 | 81.788920 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 425 KL / 20 M | RAIPUR PHUL WARI | 26.143032 | 81.782867 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.916 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 23.590 | |
| 2 | HDPE | 90 | 5.136 | |
| 3 | HDPE | 110 | 0.999 | |
| 4 | HDPE | 140 | 0.208 | |
| 5 | HDPE | 160 | 2.840 | |
| 6 | HDPE | 200 | 0.875 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1286 |