Project Completion Certificate (Ground Water)
Scheme ID: 20068074 Name of Scheme: JAMUARI & PURE MOHAMMAD NEWAJ WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 12
Total Population Covered: 5701 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 24-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL - 1 21.5/81.7 JAMUARI & PURE MOHAMMAD NEWAJ 26.379691 81.825078
2 TUBEWELL - 2 22.59/79.5 JAMUARI & PURE MOHAMMAD NEWAJ 26.409560 81.836156
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 585 LPM/56M JAMUARI & PURE MOHAMMAD NEWAJ 26.379691 81.825078
2 SUBMERSIBLE - 2 585 LPM / 56 M JAMUARI & PURE MOHAMMAD NEWAJ 26.409560 81.836156
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 350 KL / 18 M JAMUARI & PURE MOHAMMAD NEWAJ 26.379691 81.825078
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.487
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.405
2 HDPE 90 7.070
3 HDPE 110 0.575
4 HDPE 140 1.269
5 HDPE 160 0.941
6 HDPE 180 0.114
7 HDPE 200 0.213
HSC Connection
Sno. Total Nos.
1 933
Other Details
5.43
0.00
5.41
24-May-2025
24-Aug-2025