Scheme ID: 20068206 Name of Scheme: Pachurakhi Jalim Singh & Sapahi Village water supply scheme No. of Villages: 6 No. of Habitation Covered: 15
Total Population Covered: 3880 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Mar-2024 Actual Date of Completion (Capex): 12-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300*150 30m/202.07m Pachurakhi Jalim Singh & Sapahi 25.495325 82.519614
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15HP 820LPM/43M Pachurakhi Jalim Singh & Sapahi 25.495325 82.519614
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/12M Pachurakhi Jalim Singh & Sapahi 25.495021 82.919757
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0134 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.237 Yes
2 HDPE 75 1.925 Yes
3 HDPE 63 15.690 Yes
4 HDPE 110 1.606 Yes
5 HDPE 140 1.156 Yes
6 HDPE 160 0.528 Yes
7 HDPE 200 0.090 Yes
HSC Connection
Sno. Total Nos.
1 526
Other Details
3.23
3.23
2.58
12-Oct-2024
13-Oct-2024