Scheme ID: 20068395 Name of Scheme: Kaserwakalan Village Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5373 Base Year: 2037 Intermediate Year: 2057 Design Year: 2037
Date of Completion (As per Contract): 30-Mar-2023 Actual Date of Completion (Capex): 29-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.308
2 HDPE 75 0.714
3 HDPE 90 0.573
4 HDPE 160 0.111
5 HDPE 200 0.928
6 HDPE 110 0.312
HSC Connection
Sno. Total Nos.
1 1208
Other Details
3.43
0.00
0.00
19-Jul-2025
20-Jul-2025