Scheme ID: 20070853 Name of Scheme: BASANTPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2480 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 07-Feb-2024 Actual Date of Completion (Capex): 15-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 09/45.33 BASANTPUR 26.455390 81.426062
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150 KL / 16 M BASANTPUR 26.455390 81.426062
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.535
2 HDPE 90 2.974
3 HDPE 110 0.644
4 HDPE 125 0.179
5 HDPE 140 1.696
6 HDPE 160 1.054
HSC Connection
Sno. Total Nos.
1 598
Other Details
3.06
0.00
3.03
15-Dec-2024