Scheme ID: 20077104 Name of Scheme: MABAI BILBARI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2213 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 22-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 78.47/14.03 MABAI BILBARI 26.877035 79.691876
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 500/56 MABAI BILBARI 26.877035 79.691876
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/14 MABAI BILBARI 26.877035 79.691876
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.002 Clear Water Rising Main
2 DI 100 0.01910 Clear Water Rising Main
3 DI 150 0.0063 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.98 Distribution Network
2 HDPE 63 3.44 Distribution Network
3 HDPE 110 0.561 Distribution Network
4 HDPE 140 1.00 Distribution Network
5 HDPE 160 2.11 Distribution Network
HSC Connection
Sno. Total Nos.
1 394
Other Details
2.31
2.31
2.57
26-Jul-2024
27-Jul-2024