Project Completion Certificate (Ground Water)
Scheme ID: 20084295 Name of Scheme: LALAOLEE JJM No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1340 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Mar-2024 Actual Date of Completion (Capex): 06-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12M/ 102.3M LALAOLEE 27.219627 80.058906
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.28 M³ per Min /41Mtr LALAOLEE 27.219627 80.058906
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75KL/ 12Mtr LALAOLEE 27.222187 80.066445
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 100 0.01815
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 1.898
2 HDPE Pipe PN-6, Class PE-100 75 1.322
3 HDPE Pipe PN-6, Class PE-100 90 0.216
4 HDPE Pipe PN-6, Class PE-100 110 0.481
5 HDPE Pipe PN-6, Class PE-100 125 0.756
HSC Connection
Sno. Total Nos.
1 252
Other Details
1.37
0.00
1.33
05-Oct-2024
26-Sep-2025