| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20084461 | Name of Scheme: PACHPERA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2310 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 10-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18/90.34 | PACHPERA | 27.953849 | 80.018796 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 27/45 | PACHPERA | 27.953849 | 80.018796 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 125/12 | PACHPERA | 27.953878 | 80.018906 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K-7 | 100 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 3.220 | |
| 2 | HDPE/6KG | 75 | 2.414 | |
| 3 | HDPE/6KG | 90 | 0.641 | |
| 4 | HDPE/6KG | 110 | 1.352 | |
| 5 | HDPE/6KG | 140 | 0.039 | |
| 6 | HDPE/6KG | 160 | 0.065 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 505 |