Project Completion Certificate (Ground Water)
Scheme ID: 20084461 Name of Scheme: PACHPERA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2310 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 10-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/90.34 PACHPERA 27.953849 80.018796
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 27/45 PACHPERA 27.953849 80.018796
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 125/12 PACHPERA 27.953878 80.018906
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K-7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 3.220
2 HDPE/6KG 75 2.414
3 HDPE/6KG 90 0.641
4 HDPE/6KG 110 1.352
5 HDPE/6KG 140 0.039
6 HDPE/6KG 160 0.065
HSC Connection
Sno. Total Nos.
1 505
Other Details
1.75
0.00
1.75
09-Aug-2024
06-Dec-2024