Project Completion Certificate (Ground Water)
Scheme ID: 20092788 Name of Scheme: CHANDAULI Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1370 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-May-2024 Actual Date of Completion (Capex): 29-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 12.03/116.80 CHANDAULI 26.50021082 82.62616132
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 7.5 HP 0.29/43 CHANDAULI 26.50021082 82.62616132
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 75 KL/12 M CHANDAULI 26.50021082 82.62616132
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 80 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6;Class PE-100 90 0.627
2 HDPE PIPE PN-6;Class PE-100 75 0.651
3 HDPE PIPE PN-6;Class PE-100 63 1.987
4 HDPE PIPE PN-6;Class PE-100 140 0.286
HSC Connection
Sno. Total Nos.
1 230
Other Details
1.32
1.32
1.32
29-Mar-2026
30-Mar-2026