Project Completion Certificate (Ground Water)
Scheme ID: 20092791 Name of Scheme: CHILAULI JARWAL (VPL) PWS No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 2470 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Sep-2024 Actual Date of Completion (Capex): 09-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.22/265.81 Chilauli 27.21696 81.64490
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 0.55cum/min./ 42m Chilauli 27.21696 81.644909
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 150/16 Chilauli 27.21696 81.644909
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K9/DI 100 0.038
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN6/HDPE 63 7.817
2 PN6/HDPE 75 0.391
3 PN6/HDPE 90 0.360
4 PN6/HDPE 110 1.136
5 PN6/HDPE 160 1.562
6 PN6/HDPE 200 0.036
HSC Connection
Sno. Total Nos.
1 405
Other Details
2.21
2.21
2.15
09-Apr-2026
10-Apr-2026