Project Completion Certificate (Ground Water)
Scheme ID: 20096868 Name of Scheme: Nera Kripalpur No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2055 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Mar-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/145.65 Nera Kripalpur 26.308144 79.780293
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 23.20/70 Nera Kripalpur 26.308144 79.780293
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/16 Nera Kripalpur 26.308144 79.780293
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.1
2 HDPE 75 0.006
3 HDPE 90 1.435
4 HDPE 110 0.682
5 HDPE 140 0.987
HSC Connection
Sno. Total Nos.
Other Details
1.75
1.91
1.91
31-Jul-2023
01-Aug-2023