Project Completion Certificate (Ground Water)
Scheme ID: 8360547 Name of Scheme: Barsaini Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3080 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Feb-2023 Actual Date of Completion (Capex): 25-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22/78.29 Barsaini 26.7528 83.5895
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 39/40 Barsaini 26.7528 83.5895
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/12 Barsaini 26.7528 83.5895
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.703 Laying Completed
2 HDPE 75 6.136 Laying Completed
3 HDPE 90 0.748 Laying Completed
4 HDPE 110 0.395 Laying Completed
5 HDPE 140 0.78 Laying Completed
6 HDPE 160 0.325 Laying Completed
HSC Connection
Sno. Total Nos.
Other Details
2.93
0.00
2.91
07-Feb-2025
01-Mar-2026