| S.No. | District | Agency | Scheme | Village | OHT Code | Disruption Type | Disruption Date | Expected Resolve Date | Status | Remark |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Mau | KLSR - RAYS (JV) | KHIRIYA GRAM PANCHAYAT WATER SUPPLY SCHEME | Khiriya | 20085976/01 | Land Not Available / Short Land | 10-Oct-2026 | - | Pending | We have not received the land required for the project from the beginning until now. |
| 2 | Mau | KLSR - RAYS (JV) | AMIRAHA GRAM PANCHAYAT WATER SUPPLY SCHEME | Amiraha | 20085986/01 | Land Not Available / Short Land | 10-Oct-2026 | - | Pending | We have not Alloted the land required for the project from the beginning until now |
| 3 | Mau | KLSR - RAYS (JV) | RASULPUR, GP-WATER SUPPLY SCHEME | Rasulpur | 20013418/01 | Land Dispute / Litigation | 10-Oct-2026 | - | Pending | In Scheme Rasulpur, Block Ranipur, a borewell has been Completed. However, a local villager is claiming that the land where the borewell is located belongs to him. |
| 4 | Mau | KLSR - RAYS (JV) | HAJIPUR WATER SUPPLY SCHEME | Hajipur | 20100884/01 | Land Dispute / Litigation | 10-Oct-2026 | - | Pending | Under the Hazipur Scheme in Block Ranipur, local people are claiming ownership of the land where the boundary wall is proposed. Additionally, OHT excavation is not possible due to the muddy soil conditions. |
| 5 | Mau | KLSR - RAYS (JV) | DHARMSIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | Dharmsipur | 20095473/01 | Land Dispute / Litigation | 10-Oct-2026 | - | Pending | Under the Dharmsipur Scheme in Block Ranipur, an NGO is claiming ownership of the land allocated for the solar installation within the campus. |
| 6 | Mau | KLSR - RAYS (JV) | KAMTHARI NOORPUR WATER SUPPLY SCHEME | Kamthari Noorpur | 20100901/01 | Public Hindrance / Local Hindrance | 10-Oct-2026 | - | Pending | In the Kamthari Noorpur Scheme, Block Ranipur, local villagers have claimed ownership of the land after the campus boundary wall was constructed. |
| 7 | Mau | KLSR - RAYS (JV) | SAGADI & BASARATPUR WATER SUPPLY SCHEME | Basaratpur | 20085767/01 | Public Hindrance / Local Hindrance | 10-Oct-2026 | - | Pending | In the Sagadi & Basaratpur Scheme, local farmers have claimed ownership of the approach road. |
| 8 | Mau | KLSR - RAYS (JV) | PALIYA SECOND & RAIPUR WATER SUPPLY SCHEME | Paliya | 20096061/01 | Land Dispute / Litigation | 10-Oct-2026 | - | Pending | In the Paliya Second Scheme, local farmers have claimed ownership of the land designated for the approach road. |
| 9 | Mau | KLSR - RAYS (JV) | SIYA BASTI GRAM PANCHAYAT WATER SUPPLY SCHEME | Siyabasti | 20095779/01 | Land Dispute / Litigation | 10-Oct-2026 | - | Pending | Land clearance not done for Boudary wall works due to Brick clien Factory owner Isuue |
| 10 | Mau | KLSR - RAYS (JV) | FARIDPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | FARIDPUR | 20095475/01 | Public Hindrance / Local Hindrance | 10-Oct-2026 | - | Pending | Approch Road Issue. Material shifting and work start problem. Need Extension till March |
| 11 | Mau | KLSR - RAYS (JV) | KHAIRABAD DINESH WATER SUPPLY SCHEME | Kharavad | 20100957/01 | Land Not Available / Short Land | 10-Oct-2026 | - | Pending | Under the Khairabad Dnesh Scheme, land is not available for the construction of 2nd Tubewell and. |
| 12 | Mau | KLSR - RAYS (JV) | TILSAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME | Tilsawan | 20085864/01 | Land Dispute / Litigation | 10-Oct-2026 | - | Pending | In the Tilsawan Scheme, local residents have claimed ownership of the land proposed for the construction of the boundary wall. |