| 1 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
01-Jul-2026 |
|
PWD Repairing work stopped due to rainy season |
| 2 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
01-Jul-2026 |
|
PWD has damaged the pipeline from last 2.5 years. Work started on 01-05-2026 due to the intervention of ACS sir and DM Jhansi. However the same has been stopped due to rainy season. |
| 3 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
01-May-2026 |
|
PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD. |
| 4 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
01-May-2026 |
|
PWD has started attending repairs after intervention of DM Jhansi |
| 5 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
12-Jan-2024 |
|
Pwd has damaged the pipeline from last 1.5 years and not repaired it till now. |
| 6 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
12-Jan-2024 |
|
PWD has damaged the pipeline from last 2.5 years. As per the instruction of ACS sir, joint meeting was conducted by DM Jhansi. There after joint site inspection was conducted by CE- UPJN and CE- PWD and there after work has been started by PWD on 01-05-2026. However, the work has been stopped due to rainy season for two months. Due to the intervention of MD-UPJN and DM Jhansi on 01-09-2026 work re-started. The completion date will be finalised during the meeting called by DM Jhansi on 23-09-2026. |
| 7 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
12-Jan-2024 |
|
PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi.
Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm.
Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter.
Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. The work is currently in progress.
The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026. |
| 8 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
12-Jan-2024 |
31-Oct-2026 |
PWD has damaged the pipeline, and the issue has remained unresolved for the last 2.5 years. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm. Accordingly, PWD started the work on 01.05.2026. However, the work was stopped due to the rainy season and was not resumed thereafter. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. The work is currently in progress. The completion date will be finalized during the meeting convened by the DM, Jhansi, on 23.09.2026.In this meeting DM has directed to PWD remaining works would be completed as soon as possible.In complaince PWD stated that the remaining works will take 1 month for complaince . |
| 9 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
12-Jan-2024 |
|
1. PWD has damaged the pipe line during road widening in 2024. and the issue has remained unresolved.
2. After the intervention of the ACS Sir, a joint meeting of both departments was conducted by the DM, Jhansi.
3. Thereafter, a joint site inspection was carried out by the Chief Engineer (CE), UPJN, and CE, PWD.
4. It was mutually agreed that the pipeline-laying work would be carried out by PWD under the supervision of UPJN and the firm.
5. Accordingly, PWD started the work on 01.05.2026.
6. The work was stopped due to the rainy season and was not resumed thereafter.
7. Following the intervention of the MD sir - UPJN (R), the DM - Jhansi, convened a meeting with both departments, and the work was resumed on 01.09.2026. But, once again stopped by PWD from 20.09.2026.
8. In the meeting convened by the DM, Jhansi, on 23.09.2026, DM directed PWD to complete remaining works immediately. PWD stated that the remaining works will be completed by 15.10.2026.
9. However, thereafter, the work has not been resumed and no work is in progress at present. |
| 10 |
8010037 |
Kuraicha GOV |
Jhansi |
Bangra |
Arjar |
424226 |
Arjar |
Road Widening[PWD] |
19-Sep-2026 |
|
PWD-damaged pipeline has remained unresolved for the last 1.5 years. Repair work is now in progress. DM meeting is scheduled on 23-09-2026 with PWD officers for review. |