Follow us on for latest updates.    |    To Lodge Complaint Call On 18001212164   or   visit   www.jalsamadhan.in

Water Supply Issues

Sr No. Scheme Code Scheme Name OHT Code District Block Panchayat Village Code Village Issue Type Issue Date Expected Issue Resolve Date Remark
1 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-27 Banda Jaspura Amara 426117 Amara Power/Electrical Issue 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
2 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Tara 426182 Tara Road Widening[PWD] 01-Apr-2026 30-Apr-2026 Distribution pipeline damaged by PWD, DIA 140mm, 05mtr.and 25nos HSC
3 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Badokhar Khurd Bilbai 426255 Bilbai Road Widening[Other] 01-Apr-2026 20-Apr-2026 Dia-160mm 03nos locations and 05mtr pipeline damaged by electrical department during pole fixing
4 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Umarahanee 426378 Umarahanee Damage Village Internal Works 01-Apr-2026 30-Apr-2026 Pipe line and HSC damaged by Padhanji during drainage construction.
5 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Rayan 426380 Rayan Damage Village Internal Works 01-Apr-2026 30-Apr-2026 Pipe line damaged by electrical department during pole erection.
6 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Rayan 426380 Rayan Damage Village Internal Works 01-Apr-2026 30-Apr-2026 Pipeline and HSC damaged by Pradhan ji during drainage construction.
7 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kuchendo 426376 Kuchendo Damage Village Internal Works 01-Apr-2026 30-Apr-2026 Pipe line and HSC damage by Pradhanji during drainage construction
8 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Lama 426239 Lama Road Widening[PWD] 01-Apr-2026 30-Apr-2026 Pipe line damaged by PWD near LAMA village.
9 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Road Widening[PWD] 01-Apr-2026 31-May-2026 40-50 FHTC damaged during road widening
10 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Road Widening[PWD] 01-Feb-2026 30-May-2026 20nos FHTC damaged by PWD during new CC road construction
11 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-11 Banda Jaspura Dandamau 426108 Dadamau Road Widening[PWD] 01-Feb-2026 30-Apr-2026 200 HSC was damaged by the PWD during CC road construction. Despite several follow‑ups, the connection has still not been repaired by them.
12 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Atarahat 426204 Atarahat Road Widening[PWD] 01-Feb-2026 30-Apr-2026 60 HSC was damaged by the PWD during road widening and RCC drain construction. Despite several follow‑ups, the connection has still not been repaired by them.
13 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dohatara 426183 Khajuri Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Distribution pipe line damaged by PWD
14 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Distribution pipeline damaged by PWD, Water supply disturbed in approx 100 FHTC
15 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Distribution pipeline damaged BY PWD, approx 100 FHTC not getting water and 15nos portal complain pending due to this reason.
16 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Patvan 426335 Patvan Road Widening[Other] 01-Feb-2026 28-Feb-2026 Pipeline damaged by Jila Panchayat, Approx-30FHTC water supply affected
17 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Pipe line damaged by PWD
18 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-42 Banda Baberu Bhadvari 426332 Bhadvari Road Widening[Other] 01-Feb-2026 28-Feb-2026 Pipe line damaged by Jila panchayat
19 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Niwaich 426210 Niwaich Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Pipe line Damaged BY PWD
20 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Khaptiha Kalan 426217 Khaptiha Kalan Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Pipe line Damaged By PWD
21 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Road Widening[PWD] 01-Feb-2026 28-Feb-2026 Pipeline damaged By PWD. Approx 60 FHTC
22 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 01-Feb-2026 28-Feb-2026 damaged BY PWD, Kachhara Dera water supply disturb
23 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Mahokhar 426245 Mahokhar Road Widening[PWD] 01-Jan-2026 30-May-2026 Distribution pipeline damaged by PWD.
24 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Road Widening[PWD] 01-Mar-2026 31-May-2026 25 FHTC damaged during road widening
25 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Damage Village Internal Works 01-May-2026 31-May-2026 15 HSC damaged during nala construction by Zila panchayat
26 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Murwal 426359 Murwal Damage Village Internal Works 01-May-2026 31-May-2026 10 nos HSC damaged during nala construction by Pradhanji
27 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426200 Parsaunda Road Widening[PWD] 01-May-2026 31-May-2026 30 to 40 FHTC damage due to road widening
28 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Road Widening[PWD] 01-Oct-2025 31-Mar-2026 200mm HDPE pipeline damaged by PWD. water supply disturbed last 3 months in Hardoni majara of Mataundh gramin.
29 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-12 Banda Jaspura Lasada 426126 Lasada Road Widening[PWD] 02-Apr-2026 30-Apr-2026 Distribution pipeline damaged by PWD, Dia 75mm HDPE, 15mtr.
30 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Patvan 426335 Patvan Road Widening[PWD] 02-Apr-2026 20-Apr-2026 Dia-160mm , 05mtr pipeline damged by PWD.
31 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
32 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-11 Banda Jaspura Dandamau 426108 Dadamau Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
33 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-12 Banda Jaspura Lasada 426126 Lasada Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
34 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-13 Banda Jaspura Ichhawar 426139 Ichhawar Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
35 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
36 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-20 Banda Jaspura Adari 426129 Pachkauri Power/Electrical Issue 02-Aug-2025 04-Aug-2025 Due to bad weather condition solar pumps not work efficient.
37 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
38 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-24 Banda Jaspura Rampur 426110 Rampur Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
39 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-26 Banda Jaspura Narayarh 426111 Narayarh Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
40 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-26 Banda Jaspura Narayarh 426111 Narayarh Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
41 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-27 Banda Jaspura Amara 426117 Amara Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
42 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 02-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
43 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to heavy rain, power fluctuations
44 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
45 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-19 Banda Jaspura Narjita 426123 Sikuwa Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
46 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
47 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 02-Aug-2025 04-Aug-2025 Due to bad weather condition solar pumps not work efficient.
48 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 02-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
49 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 02-Mar-2025 Power line connected with local Belgaun tube well feeder approx 6-8hrs electricity supply per day with maximum power cut.
50 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Power/Electrical Issue 02-Mar-2025 Low voltage issue .
51 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Road Widening[PWD] 02-May-2026 31-May-2026 40 fhtc damaged during convert construction
52 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Local Repairing 02-Oct-2025 03-Oct-2025 NETWORK ISSUE
53 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 02-Oct-2025 03-Oct-2025 NETWORK ISSUE
54 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Mahokhar 426245 Mahokhar Power/Electrical Issue 02-Oct-2025 03-Jan-2025 33 KV Power outage from wtp and intake well locations
55 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-32 Banda Baberu Jalalpur 426340 Jalalpur Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
56 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
57 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-36 Banda Baberu Badaulee 426343 Badaulee Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
58 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-40 Banda Baberu Sanda 426305 Sanda Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
59 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
60 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
61 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
62 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-48 Banda Tindwari Bambiya 426197 Bhadauli Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
63 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
64 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Bhindaura 426168 Bhindaura Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
65 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
66 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Piparahari 426216 Piparahari Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
67 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Rahuta 426221 Rahuta Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
68 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-57 Banda Tindwari Terahi Mafi 426153 Sonrahi Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
69 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-58 Banda Tindwari Bahinga 426159 Arsaunda Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
70 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-60 Banda Badokhar Khurd Saimara 426247 Saimara Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
71 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
72 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
73 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-65 Banda Tindwari Mahui 426209 Gohurwa Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
74 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
75 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-68 Banda Badokhar Khurd Luktara 426229 Luktara Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
76 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Chheharao 426231 Chheharao Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
77 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-70 Banda Badokhar Khurd Chahitara 426235 Chahitara Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
78 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-71 Banda Badokhar Khurd Chakchatgan 426233 Chakchatgan Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
79 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
80 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
81 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Doha 426254 Doha Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
82 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 02-Oct-2025 03-Oct-2025 Due to bad weather condition solar pumps not work efficient
83 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
84 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 02-Oct-2025 03-Oct-2025 Network issue
85 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
86 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Power/Electrical Issue 02-Oct-2025 03-Oct-2025 33 KV Power outage from wtp and intake well locations
87 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Power/Electrical Issue 02-Sep-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
88 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-34 Banda Tindwari Lohari 426164 Lohari Power/Electrical Issue 02-Sep-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
89 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-30 Banda Kamasin Kuchouli 426450 Kuchouli Power/Electrical Issue 04-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
90 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Power/Electrical Issue 04-Aug-2025 04-Aug-2025 power supply issue .main cause of the transmission lines 33kv whitch supply power to the 11 kv substation at jaspura and kanakeda was submerged due heavy floods
91 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 04-Aug-2025 03-Aug-2025 Due to bad weather condition solar pumps not work efficient.
92 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Power/Electrical Issue 04-Jan-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
93 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-1 Banda Badokhar Khurd Marauli 426278 Marauli Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
94 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-12 Banda Jaspura Lasada 426126 Lasada Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
95 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-13 Banda Jaspura Ichhawar 426139 Ichhawar Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
96 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
97 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
98 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-16 Banda Jaspura Amara 426118 Madauli Khurd Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
99 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
100 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
101 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-18 Banda Jaspura Gadola 426147 Gadola Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
102 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
103 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
104 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
105 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
106 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
107 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
108 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
109 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
110 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
111 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
112 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
113 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Achhah 426328 Jugrehlee Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
114 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-32 Banda Baberu Jalalpur 426341 Gaura Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
115 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
116 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-39 Banda Baberu Mantha 426313 Mantha Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
117 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
118 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Murwal 426359 Murwal Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
119 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
120 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Piparahari 426216 Piparahari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
121 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Kukuwa Khas 426215 Kukuwa Khas Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
122 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Paparenda 426199 Paparenda Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
123 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Pachulla 426234 Pachulla Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
124 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
125 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Kul Kumhari 426262 Kul Kumhari Power/Electrical Issue 04-Sep-2025 05-Sep-2025 water is being physically supplied but due to power outages at the wate treatment plant(WTP) The actual water supply data has not been updated at JJM Portal
126 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426203 Barethi Ashkaran Road Widening[PWD] 05-Apr-2026 30-Apr-2026 Pipe damaged by PWD, Dia-160mm, 10mtr.
127 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 06-Aug-2025 19-Oct-2025 As informed by DVVNL the power connection for Aliha CWR will be shfited from belgov tube well feeder to Aliha
128 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 06-Aug-2025 08-Aug-2025 Power line connected with local Belgaun tube well feeder approx 6-8hrs electricity supply per day with maximum power cut.
129 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 06-Nov-2025 07-Nov-2025 Due to bad weather condition solar pumps do not work efficient
130 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 06-Nov-2025 07-Nov-2025 Due to bad weather condition solar pumps do not work efficient
131 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 06-Nov-2025 07-Nov-2025 Network issue
132 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Mahokhar 426245 Mahokhar Power/Electrical Issue 06-Nov-2025 07-Nov-2025 power outage at baberu dehat cwr
133 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 06-Nov-2025 07-Nov-2025 network issue
134 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 06-Nov-2025 07-Nov-2025 Network issue
135 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-49 Banda Tindwari Mata 426166 Mata Local Repairing 06-Nov-2025 07-Nov-2025 Network issue
136 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 06-Oct-2025 07-Oct-2025 power fluctuations
137 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 06-Oct-2025 07-Oct-2025 network issue
138 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 06-Oct-2025 07-Oct-2025 Due to bad weather condition solar pumps not work efficient
139 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 06-Oct-2025 07-Oct-2025 Due to bad weather condition solar pumps not work efficient
140 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 06-Oct-2025 07-Oct-2025 network issue
141 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-49 Banda Tindwari Jasaipur 426167 Kalyanpur Local Repairing 06-Oct-2025 07-Oct-2025 DI pipe leakage rectification work in progreses
142 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Power/Electrical Issue 07-Aug-2025 15-Oct-2025 low voltage rectification work in progreases
143 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Power/Electrical Issue 07-Aug-2025 08-Aug-2025 Low voltage issue .
144 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
145 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
146 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
147 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
148 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Poon 426325 Poon Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
149 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
150 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
151 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Bhindaura 426168 Bhindaura Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
152 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
153 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Ghan Saul 426365 Ghan Saul Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
154 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
155 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-65 Banda Tindwari Gokhrahi 426211 Gokhrahi Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
156 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426201 Bachheura Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
157 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
158 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Alampur 426356 Alampur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
159 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
160 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
161 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Poon 426325 Poon Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
162 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kuchendo 426376 Kuchendo Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
163 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
164 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Bhindaura 426168 Bhindaura Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
165 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Godhani 426227 Godhani Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
166 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Ghan Saul 426364 Janvara Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
167 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
168 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
169 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-48 Banda Tindwari Khaunda 426176 Datarauli Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
170 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
171 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
172 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
173 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Ladakapurwa 426272 Bhawani Purwa Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
174 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
175 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
176 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426252 Jaurahi Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
177 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
178 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
179 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
180 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
181 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Ladakapurwa 426272 Bhawani Purwa Local Repairing 07-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
182 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 07-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
183 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Pachulla 426234 Pachulla Road Widening[PWD] 08-Feb-2026 28-Feb-2026 Pipe line damaged by PWD
184 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 08-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
185 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-25 Banda Jaspura Sikahula 426120 Sikahula Power/Electrical Issue 08-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
186 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 08-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
187 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Local Repairing 08-Sep-2025 09-Sep-2025 network issue
188 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 08-Sep-2025 09-Sep-2025 net work isuue
189 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-13 Banda Jaspura Ichhawar 426139 Ichhawar Local Repairing 08-Sep-2025 09-Sep-2025 motor repaing work was completed
190 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 08-Sep-2025 09-Sep-2025 network issue
191 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 08-Sep-2025 09-Sep-2025 network issue
192 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-16 Banda Jaspura Amara 426118 Madauli Khurd Power/Electrical Issue 08-Sep-2025 09-Sep-2025 due to bad weather condition solar pumps not work efficient.
193 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Road Widening[PWD] 09-Jan-2026 15-Jan-2025 Rising main Pipeline damaged by PWD due to road widening.
194 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
195 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Achhah 426328 Jugrehlee Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
196 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
197 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
198 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-48 Banda Tindwari Khaunda 426174 Khaunda Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
199 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
200 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Piparahari 426216 Piparahari Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
201 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Rahuta 426221 Rahuta Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
202 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Godhani 426227 Godhani Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
203 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
204 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Pista 426363 Pista Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
205 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
206 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
207 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Pachulla 426234 Pachulla Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
208 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-70 Banda Badokhar Khurd Mawai Buzurg 426237 Mawai Buzurg Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
209 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
210 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426252 Jaurahi Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
211 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
212 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
213 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-76 Banda Badokhar Khurd Barokhar Khurd 426269 Barokhar Khurd Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
214 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
215 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 09-Oct-2025 11-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
216 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Local Repairing 09-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
217 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Local Repairing 09-Sep-2025 09-Sep-2025 Due to raising main pipe line leak rectification work under progresses
218 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426200 Parsaunda Road Widening[PWD] 10-Apr-2026 30-Apr-2026 pipe damged by PWD, Dia-75, 10mtrs and 20nos HSC
219 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-37 Banda Tindwari Palara 426188 Palara Road Widening[PWD] 10-Apr-2026 30-Apr-2026 23nos HSC damaged by PWD
220 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dohatara 426184 Dohatara Road Widening[PWD] 10-Apr-2026 30-Jan-2026 Distribution pipeline damaged by PWD, Dia-75mm HDPE, 10mtrs
221 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Damage Village Internal Works 10-Aug-2026 31-May-2026 Pipe line damaged during new road construction, 50-60house hold not getting water.
222 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426367 Para Bihari Damage Village Internal Works 10-Dec-2025 20-Mar-2026 Pipeline and FHTC damaged by village pradhan during road work
223 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Road Widening[PWD] 10-Feb-2026 30-Apr-2026 50 HSC was damaged by the PWD during CC road construction. Despite several follow‑ups, the connections has still not been repaired by them.
224 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Local Repairing 10-Jul-2025 Due to Nala construction PWD contractor damage Satar village distribution pipe line.
225 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Road Widening[PWD] 10-Mar-2026 31-May-2026 20 HSC damaged during road construction.
226 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Road Widening[PWD] 10-May-2025 Due to road widening and nala Construction by PWD main distribution line of 200mm HDPE approx.-700mtr full length damaged with 20nos HSC connection.
227 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 10-Nov-2025 11-Nov-2025 Network issue
228 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 10-Nov-2025 11-Nov-2025 network issue
229 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 10-Nov-2025 11-Nov-2025 Due to bad weather condition solar pumps do not work efficient
230 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 10-Nov-2025 11-Nov-2022 power outage
231 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 10-Nov-2025 11-Nov-2025 Due to bad weather condition solar pumps do not work efficient
232 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 10-Nov-2025 11-Nov-2025 network issue
233 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 10-Nov-2025 11-Nov-2025 Network issue
234 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Achhah 426328 Jugrehlee Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
235 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
236 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
237 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Pista 426363 Pista Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
238 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Godhani 426227 Godhani Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
239 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
240 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426252 Jaurahi Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
241 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
242 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Mahokhar 426245 Mahokhar Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
243 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
244 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
245 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-76 Banda Badokhar Khurd Barokhar Khurd 426269 Barokhar Khurd Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
246 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
247 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
248 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Hateti Purwa 426295 Hateti Purwa Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
249 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
250 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
251 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Local Repairing 10-Oct-2025 14-Oct-2025 Rising main DI K9 -800mm Dia pipe line leakage repairing work in progress
252 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dohatara 426184 Dohatara Road Widening[PWD] 11-Feb-2026 28-Feb-2026 Distribution pipe line damaged by PWD
253 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Road Widening[PWD] 11-Sep-2025 PWD Dept pipe line damaged K9-350 MM DIA
254 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Atarahat 426204 Atarahat Road Widening[PWD] 12-Feb-2026 31-May-2026 30 to 40 FHTC damage during road widening
255 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 12-Sep-2025 13-Sep-2025 network issue
256 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 12-Sep-2025 13-Sep-2025 network issue
257 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 12-Sep-2025 13-Sep-2025 due to bad weather condition solar pumps not work efficient.
258 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 12-Sep-2025 13-Sep-2025 due to bad weather condition solar pumps not work efficient.
259 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Local Repairing 12-Sep-2025 13-Sep-2025 At jhanjhari ph-2 new transformer installed work was completed
260 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 12-Sep-2025 13-Sep-2025 Network isuue
261 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Local Repairing 12-Sep-2025 13-Sep-2025 scada mainteance work was completed
262 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 12-Sep-2025 13-Sep-2025 network issue
263 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Lama 426239 Lama Road Widening[PWD] 13-Feb-2026 28-Feb-2026 Pipeline damaged BY PWD
264 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 13-Nov-2025 14-Nov-2025 Due to bad weather condition solar pumps do not work efficient
265 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 13-Nov-2025 14-Nov-2025 Due to bad weather condition solar pumps do not work efficient
266 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 13-Nov-2025 14-Nov-2025 Network Issue
267 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 13-Nov-2025 14-Nov-2025 Network issue
268 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 13-Nov-2025 14-Nov-2025 network isue
269 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Niwaich 426210 Niwaich Road Widening[PWD] 14-Feb-2026 28-Feb-2026 Pipeline line damaged by PWD in Niwaich village
270 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 14-Sep-2025 network issue
271 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 14-Sep-2025 15-Sep-2025 network issue
272 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Local Repairing 14-Sep-2025 15-Sep-2025 due to bad weather condition solar pumps not work efficient.
273 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 14-Sep-2025 15-Sep-2025 due to bad weather condition solar pumps not work efficient.
274 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 14-Sep-2025 15-Sep-2025 network isuue
275 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Local Repairing 14-Sep-2025 15-Sep-2025 network issue
276 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 14-Sep-2025 15-Sep-2025 network issue
277 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Alona 426219 Alona Local Repairing 14-Sep-2025 15-Sep-2025 PWD Dept pipe line damaged work was completed
278 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 14-Sep-2025 15-Sep-2025 network issue
279 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Road Widening[PWD] 15-Feb-2026 28-Feb-2026 Distribution pipeline damaged by PWD. in Kumariya dera
280 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Road Widening[PWD] 15-Feb-2026 28-Feb-2026 Rising main Pipeline damaged by PWD Near Tara Village
281 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Laumar 426181 Laumar Road Widening[PWD] 15-Feb-2026 28-Feb-2026 Rising main pipeline damaged by PWD near TARA village.
282 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Mirgahani 426149 Mirgahani Damage Village Internal Works 15-Feb-2026 20-Mar-2026 Distribution pipeline and FHTC damaged by Zilapanchayat drainage work
283 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Lama 426239 Lama Damage Village Internal Works 15-Feb-2026 20-Mar-2026 FHTC and pipe line damged by Village pradhan due to drainage work
284 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426367 Para Bihari Damage Village Internal Works 15-Mar-2026 30-Apr-2026 Pipe line and HSC damaged by block level agency during drainage construction.
285 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 15-Sep-2025 16-Sep-2025 power outage
286 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 15-Sep-2025 16-Sep-2025 power outage
287 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 15-Sep-2025 16-Sep-2025 network issue
288 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 15-Sep-2025 16-Sep-2025 network issue
289 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 15-Sep-2025 16-Sep-2025 network issue
290 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 15-Sep-2025 16-Sep-2025 due to bad weather condition solar pumps not work efficient.
291 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 15-Sep-2025 16-Sep-2025 due to bad weather condition solar pumps not work efficient.
292 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-30 Banda Kamasin Kuchouli 426450 Kuchouli Power/Electrical Issue 15-Sep-2025 16-Sep-2025 Due to bad weather condition solar pumps not work efficient.
293 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 15-Sep-2025 16-Sep-2025 NETWORK ISSUE
294 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 15-Sep-2025 16-Sep-2025 due to bad weather condition solar pumps not work efficient.
295 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Patvan 426335 Patvan Damage Village Internal Works 17-Apr-2026 30-Apr-2026 pipeline dammed by Jilapanchayat work, during Nala construction.
296 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-41 Banda Baberu Arthara 426319 Arthara Road Widening[PWD] 17-Mar-2026 31-Mar-2026 Pipe line damaged by PWD during construction of Colvert
297 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 17-Nov-2025 18-Nov-2025 Network issue
298 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 17-Nov-2025 18-Nov-2025 Network issue
299 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 17-Nov-2025 18-Nov-2025 Due to bad weather condition solar pumps do not work efficient
300 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 17-Nov-2025 18-Nov-2025 network issues
301 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 17-Nov-2025 18-Nov-2025 network issues
302 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Local Repairing 17-Nov-2025 18-Nov-2025 network issues
303 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Rahuta 426221 Rahuta Local Repairing 17-Nov-2025 18-Nov-2025 network issues
304 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 17-Nov-2025 18-Nov-2025 network issues
305 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Rahuta 426221 Rahuta Road Widening[PWD] 18-Jul-2025 During PWD road widening they damaged our DI-9 rising main pipe line approx 80 mtr length.
306 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 18-Sep-2025 19-Sep-2025 Power outage at due to heavy rain
307 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 18-Sep-2025 19-Sep-2025 Due to bad weather condition solar pumps not work efficient
308 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 18-Sep-2025 19-Sep-2025 power fluctuations
309 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 18-Sep-2025 19-Sep-2025 Due to bad weather condition solar pumps not work efficient
310 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 18-Sep-2025 19-Sep-2025 Due to bad weather condition solar pumps not work efficient
311 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 18-Sep-2025 19-Sep-2025 network isuue
312 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 18-Sep-2025 19-Sep-2025 network issue
313 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 18-Sep-2025 19-Sep-2025 power outage at baberu dheat pump house
314 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 18-Sep-2025 19-Sep-2025 pipe line leak rectification work under progresses
315 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Mirgahani 426149 Mirgahani Damage Village Internal Works 19-May-2026 31-May-2026 10HSC damaged during nala construction by Pradhanji
316 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Road Widening[PWD] 20-Feb-2026 28-Feb-2026 Pipeline and HSC damaged by PWD
317 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Rayan 426380 Rayan Damage Village Internal Works 20-Jan-2026 20-Mar-2026 Pipeline damaged by electrical department during pole fixing
318 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Road Widening[PWD] 20-Jun-2025 30-Jun-2026 200mm HDPE pipeline damaged by PWD during CC road construction near Hardoni.
319 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Local Repairing 20-Mar-2025 18-Oct-2025 During road widening activities the PWD Department damaged the Nari OHT Inlet pipe line rectification work is currently under way
320 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 20-Mar-2025 18-Oct-2025 During road widening activities the PWD Department damaged the Nari OHT Inlet pipe line rectification work is currently under way
321 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Nelathu 426372 Nelathu Road Widening[PWD] 20-Mar-2026 31-Mar-2026 Distribution Pipe line damaged by PWD
322 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 20-May-2025 During PWD road widening they damaged our DI-9 rising main pipe line approx 6km length.
323 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 20-Nov-2025 21-Nov-2025 network issue
324 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 20-Nov-2025 21-Nov-2025 power outage
325 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 20-Nov-2025 21-Nov-2025 Due to bad weather condition solar pumps do not work efficient
326 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 20-Nov-2025 21-Nov-2025 Dvvnl Dept Transformer Rectification work in progreses
327 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 20-Nov-2025 21-Nov-2025 Due to bad weather condition solar pumps do not work efficient
328 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 20-Nov-2025 21-Nov-2025 NETWORK ISSUES
329 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 20-Nov-2025 21-Nov-2025 NETWORK ISSUES
330 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Local Repairing 20-Nov-2025 21-Nov-2025 Network issues
331 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 20-Nov-2025 21-Nov-2025 network issues
332 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Local Repairing 20-Nov-2025 21-Nov-2025 Flow meter cable rectification work was completed
333 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 20-Nov-2025 21-Nov-2025 PWD dept damaged pipe line rectification work in progrses
334 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-57 Banda Tindwari Terahi Mafi 426152 Terahi Mafi Local Repairing 20-Nov-2025 21-Nov-2025 network issues
335 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 20-Nov-2025 21-Nov-2025 network issues
336 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 21-Sep-2025 22-Sep-2025 network issue
337 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Local Repairing 21-Sep-2025 22-Sep-2025 flow meter cable damaged rectification work was done for your kind information sir
338 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dighwat 426187 Dighwat Road Widening[PWD] 22-Apr-2026 30-Apr-2026 The pipeline has been damaged repeatedly by PWD activities. Each time, the damage was repaired by our team; however, the issue continues to recur.
339 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Local Repairing 22-Sep-2025 23-Sep-2025 network issue
340 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 22-Sep-2025 23-Sep-2025 Due to bad weather condition solar pumps not work efficient
341 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 22-Sep-2025 23-Sep-2025 Due to bad weather condition solar pumps not work efficient
342 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 22-Sep-2025 23-Sep-2025 network isuue
343 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-2 Banda Badokhar Khurd Chamraha 426288 Chamraha Tullu Pump 23-Jul-2025 30-Jul-2025 Villagers use tullu pump direct from supply line, due to not getting water some house holders
344 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Road Widening[PWD] 23-Jul-2025 15-Aug-2025 During PWD road widening they damaged our DI-9 rising main pipe line approx 6km length.
345 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 23-Oct-2025 24-Oct-2025 Network issue
346 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 23-Oct-2025 24-Oct-2025 power fluctuvation
347 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 23-Oct-2025 24-Oct-2025 Due to bad weather condition solar pumps not work efficien
348 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 23-Oct-2025 24-Oct-2025 Due to bad weather condition solar pumps not work efficien
349 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 23-Oct-2025 24-Oct-2025 network issue
350 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 23-Oct-2025 24-Oct-2025 network issue
351 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-52 Banda Tindwari Nari 426213 Nari Local Repairing 23-Oct-2025 24-Oct-2025 network issue
352 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Road Widening[PWD] 25-Jun-2025 30-May-2026 Pipeline damaged by PWD during road widening. approx 1.6km and 60HSC.
353 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 25-Sep-2025 26-Sep-2025 network issue
354 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Local Repairing 25-Sep-2025 26-Sep-2025 netwotk isuue
355 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 25-Sep-2025 26-Sep-2025 network issue
356 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 25-Sep-2025 26-Sep-2025 Due to bad weather condition solar pumps not work efficient
357 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 25-Sep-2025 26-Sep-2025 Due to bad weather condition solar pumps not work efficient
358 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Baberu Aliha 426361 Aliha Power/Electrical Issue 25-Sep-2025 26-Sep-2025 power outage
359 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Power/Electrical Issue 25-Sep-2025 26-Sep-2025 power outage
360 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 27-Aug-2025 28-Aug-2025 due to bad weather condition solar pumps not work efficient.
361 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 27-Aug-2025 power fluctuations
362 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Umarahanee 426378 Umarahanee Damage Village Internal Works 27-Jan-2026 20-Mar-2026 Pipeline damaged by village pradhan
363 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-1 Banda Badokhar Khurd Marauli 426278 Marauli Power/Electrical Issue 27-Jul-2025 28-Jul-2025 Due to heavy rain, power outage
364 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-10 Banda Jaspura Padohara 426105 Padohara Power/Electrical Issue 27-Jul-2025 28-Jul-2025 Due to heavy rain, power outage
365 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-13 Banda Jaspura Ichhawar 426139 Ichhawar Local Repairing 27-Jul-2025 28-Jul-2025 Pump repairing work
366 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 27-Jul-2025 28-Jul-2025 Due to heavy rain, power fluctuations
367 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 27-Jul-2025 28-Jul-2025 power fluctuation due to heavy rain
368 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 27-Jul-2025 28-Jul-2025 due to bad weather condition solar pumps not work efficient.
369 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
370 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
371 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-30 Banda Kamasin Kuchouli 426450 Kuchouli Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
372 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Local Repairing 27-Oct-2025 28-Oct-2025 Network issue
373 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-8 Banda Badokhar Khurd Chamraha 426289 Jakhaura Local Repairing 27-Oct-2025 28-Oct-2025 NETWORK ISSUE
374 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Badokhar Khurd Pandui 426297 Pandui Local Repairing 27-Oct-2025 28-Oct-2025 Net work issue
375 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-19 Banda Jaspura Narjita 426123 Sikuwa Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
376 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 27-Oct-2025 28-Oct-2025 Due to bad weather condition solar pumps not work efficient
377 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-11 Banda Jaspura Dandamau 426108 Dadamau Power/Electrical Issue 28-Aug-2025 29-Aug-2025 Network issue
378 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 28-Aug-2025 29-Aug-2025 network issue
379 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 28-Aug-2025 29-Aug-2025 Network isuue
380 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 28-Aug-2025 29-Aug-2025 due to bad weather condition solar pumps not work efficient
381 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
382 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
383 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Dhaunsar 426161 Dhaunsar Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
384 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-60 Banda Badokhar Khurd Saimara 426247 Saimara Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
385 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Pista 426363 Pista Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
386 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
387 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Badokhar Khurd Karahiya 426240 Karahiya Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
388 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Power/Electrical Issue 28-Aug-2025 29-Aug-2025 33 KV Electrical line shunt down due to maintenance work purpose
389 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 28-Aug-2025 29-Aug-2025 power fluctuations
390 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
391 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
392 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
393 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426367 Para Bihari Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
394 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Godhani 426227 Godhani Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
395 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Pista 426363 Pista Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
396 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Khaptiha Kalan 426217 Khaptiha Kalan Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
397 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Palhari 426271 Palhari Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
398 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
399 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
400 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
401 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
402 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
403 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
404 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
405 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Hateti Purwa 426295 Hateti Purwa Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
406 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Ladakapurwa 426274 Ladaka Purwa Local Repairing 29-Aug-2025 30-Aug-2025 Due to D.I Raising Main Pipe Line Leakage Rectification Work Was Completed
407 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-16 Banda Jaspura Amara 426118 Madauli Khurd Power/Electrical Issue 29-Aug-2025 30-Aug-2025 due to bad weather condition solar pumps not work efficient
408 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 29-Aug-2025 30-Aug-2025 due to bad weather condition solar pumps not work efficient
409 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-25 Banda Jaspura Sikahula 426120 Sikahula Power/Electrical Issue 29-Aug-2025 30-Aug-2025 due to bad weather condition solar pumps not work efficient
410 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 29-Aug-2025 30-Aug-2025 power fluctuations
411 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 29-Aug-2025 30-Aug-2025 power fluctuations
412 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Nelathu 426372 Nelathu Damage Village Internal Works 30-Jan-2026 20-Mar-2026 Distribution pipeline damaged by Zilapa panchayat drainage work
413 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-12 Banda Jaspura Lasada 426126 Lasada Local Repairing 30-Jul-2025 31-Jul-2025 Motor rectification work
414 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Power outage due to heavy rain
415 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-15 Banda Jaspura Gadariya 426116 Gadariya Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, power fluctuations
416 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 30-Jul-2025 01-Aug-2025 due to bad weather condition solar pumps not work efficient.
417 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-24 Banda Jaspura Rampur 426110 Rampur Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, power fluctuations
418 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Transformer terminal connection Rectification work.
419 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, power fluctuations
420 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, Network Issue
421 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-9 Banda Jaspura Madauli Kalan 426135 Madauli Kalan Power/Electrical Issue 30-Jul-2025 01-Aug-2025 due to bad weather condition solar pumps not work efficient.
422 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 30-Jul-2025 31-Jul-2025 Due to heavy rain, power fluctuations
423 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 31-Aug-2025 30-Aug-2025 due to bad weather condition solar pumps not work efficient
424 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
425 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Alampur 426356 Alampur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
426 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-34 Banda Tindwari Lohari 426164 Lohari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
427 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-36 Banda Baberu Badaulee 426343 Badaulee Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
428 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-37 Banda Tindwari Barethi Kalan 426195 Barethi Kalan Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
429 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Ban Baroulee 426312 Ban Baroulee Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
430 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-39 Banda Baberu Mantha 426313 Mantha Power/Electrical Issue 31-Aug-2025 01-Aug-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
431 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-40 Banda Baberu Sanda 426305 Sanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
432 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-42 Banda Baberu Baghela 426344 Baghela Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
433 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Aug-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
434 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
435 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
436 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
437 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Poon 426325 Poon Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
438 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kuchendo 426376 Kuchendo Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
439 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dohatara 426184 Dohatara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
440 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
441 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
442 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Niwaich 426210 Niwaich Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
443 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-58 Banda Tindwari Bahinga 426156 Bahinga Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
444 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-59 Banda Baberu Ragoulee 426350 Baghanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
445 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-59 Banda Baberu Ragoulee 426350 Baghanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
446 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
447 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
448 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-59 Banda Baberu Ragoulee 426351 Maduva Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
449 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
450 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Baroulee Azam 426371 Baroulee Azam Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
451 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426201 Bachheura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
452 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
453 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
454 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426251 Dadariya Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
455 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Chhanehara Lalpur 426261 Chhanehara Lalpur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
456 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Kurauli 426264 Bakchha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
457 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Bharkhari 426265 Bharkhari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
458 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
459 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
460 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
461 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-80 Banda Badokhar Khurd Ganchha 426300 Ganchha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
462 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-1 Banda Badokhar Khurd Marauli 426278 Marauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
463 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
464 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
465 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-21 Banda Jaspura Jhanjhari 426109 Jhanjhari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
466 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
467 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
468 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
469 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-3 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
470 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-4 Banda Badokhar Khurd Mataundh(gramin) 426286 Mataundh(gramin) Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
471 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-5 Banda Badokhar Khurd Goyara Mugali 426284 Goyara Mugali Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
472 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-6 Banda Badokhar Khurd Durendi 426293 Durendi Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
473 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-7- Banda Badokhar Khurd Durendi 426293 Durendi Power/Electrical Issue 31-Aug-2025 01-Sep-2025 yesterday data could not be updated on the jjm portal due to power outages at wtp
474 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426245 Banda Badokhar Khurd Bargahani 426243 Bargahani Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
475 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 426328 Banda Baberu Alampur 426356 Alampur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
476 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-51 Banda Tindwari Bhindaura 426168 Bhindaura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
477 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-53 Banda Tindwari Dighwat 426187 Dighwat Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
478 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-54 Banda Tindwari Chilla 426179 Chilla Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
479 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-55 Banda Tindwari Niwaich 426210 Niwaich Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
480 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-56 Banda Tindwari Kukuwa Khas 426215 Kukuwa Khas Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
481 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-58 Banda Tindwari Bahinga 426156 Bahinga Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
482 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-59 Banda Baberu Ragoulee 426350 Baghanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
483 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-60 Banda Badokhar Khurd Fatpurwa 426248 Fatpurwa Power/Electrical Issue 31-Aug-2025 02-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
484 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-61 Banda Tindwari Bhujauli 426223 Bhujauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
485 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Badokhar Khurd Maudaha 426256 Maudaha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
486 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-62 Banda Badokhar Khurd Bilbai 426255 Bilbai Power/Electrical Issue 31-Aug-2025 02-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
487 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-63 Banda Baberu Ghan Saul 426364 Janvara Power/Electrical Issue 31-Aug-2025 01-Feb-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
488 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-64 Banda Baberu Shiv 426370 Mavae Junnardar Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
489 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-65 Banda Tindwari Mahui 426209 Gohurwa Power/Electrical Issue 31-Aug-2025 02-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
490 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-66 Banda Tindwari Parsaunda 426201 Bachheura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
491 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-67 Banda Tindwari Khairei 426218 Khairei Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
492 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-68 Banda Badokhar Khurd Luktara 426229 Luktara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
493 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-69 Banda Badokhar Khurd Chheharao 426231 Chheharao Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
494 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-70 Banda Badokhar Khurd Chahitara 426235 Chahitara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
495 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-71 Banda Badokhar Khurd Chakchatgan 426233 Chakchatgan Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
496 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-72 Banda Badokhar Khurd Gureh 426276 Gureh Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
497 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-73 Banda Badokhar Khurd Jaurahi 426252 Jaurahi Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
498 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-74 Banda Badokhar Khurd Doha 426254 Doha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
499 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-75 Banda Badokhar Khurd Kurauli 426264 Bakchha Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
500 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-76 Banda Badokhar Khurd Barokhar Khurd 426269 Barokhar Khurd Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
501 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-77 Banda Badokhar Khurd Bandha Purwa 426296 Bandha Purwa Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
502 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-78 Banda Mahua Madhopur 426622 Madhopur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
503 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-79 Banda Badokhar Khurd Ganchha 426299 Kunwarpur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
504 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-1 Banda Badokhar Khurd Marauli 426278 Marauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
505 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-14 Banda Jaspura Baragaon 426132 Baragaon Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
506 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-17 Banda Jaspura Gauri Kalan 426104 Gauri Kalan Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
507 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-22 Banda Jaspura Barehta 426119 Barehta Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
508 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
509 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-23 Banda Jaspura Jaspura 426103 Jaspura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
510 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-24 Banda Jaspura Rampur 426110 Rampur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
511 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-27 Banda Jaspura Amara 426117 Amara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
512 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-28 Banda Jaspura Adari 426128 Adari Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
513 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. OHT-29 Banda Jaspura Khaptiha Khurd 426115 Khaptiha Khurd Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
514 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-32 Banda Baberu Jalalpur 426341 Gaura Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
515 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
516 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-33 Banda Tindwari Amli Kaur 426178 Amli Kaur Power/Electrical Issue 31-Aug-2025 02-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
517 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-36 Banda Baberu Badaulee 426343 Badaulee Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
518 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-37 Banda Tindwari Bambiya 426196 Bambiya Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
519 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-38 Banda Baberu Ban Baroulee 426312 Ban Baroulee Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
520 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-40 Banda Baberu Sanda 426305 Sanda Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
521 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-41 Banda Baberu Arthara 426319 Arthara Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
522 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
523 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-41 Banda Baberu Tharthuwa 426334 Guroulee Sukla Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
524 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-43 Banda Baberu Achhah 426327 Achhah Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
525 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-45 Banda Baberu Santar 426375 Santar Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
526 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-46 Banda Baberu Kayal 426377 Kayal Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
527 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Para Bihari 426366 Koraree Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
528 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-48 Banda Tindwari Bambiya 426197 Bhadauli Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
529 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-50 Banda Tindwari Bhujrakh 426160 Bhujrakh Power/Electrical Issue 31-Aug-2025 01-Sep-2025 Due to power outage at the wtp intakewell and few cwr"s limited water was supplied
530 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. S-47 Banda Baberu Murwal 426359 Murwal Damage Village Internal Works 31-Jan-2026 20-Mar-2026 Pipeline and FHTC damaged by village pradhan during village road work