Project Completion Certificate (Ground Water)
Scheme ID: 20000736 Name of Scheme: Udupur No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2173 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 19-Oct-2022 Actual Date of Completion (Capex): 20-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep tube well (600LPM) 21/127.15 udupur 26.04903 80.506209
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 600LPM/56MTR udupur 26.04903 80.506209
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER Head Tank 125KL/12 Mtr udupur 26.04903 80.506209
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 125 .03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.883
2 HDPE 110 0.08
3 HDPE 125 1.462
4 HDPE 140 2.266
5 HDPE 160 0.6
HSC Connection
Sno. Total Nos.
1 386
Other Details
2.00
0.06
2.06
24-Sep-2023
24-Sep-2024