| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20000736 | Name of Scheme: Udupur | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2173 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 19-Oct-2022 | Actual Date of Completion (Capex): 20-May-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep tube well (600LPM) | 21/127.15 | udupur | 26.04903 | 80.506209 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 600LPM/56MTR | udupur | 26.04903 | 80.506209 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER Head Tank | 125KL/12 Mtr | udupur | 26.04903 | 80.506209 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 125 | .03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.883 | |
| 2 | HDPE | 110 | 0.08 | |
| 3 | HDPE | 125 | 1.462 | |
| 4 | HDPE | 140 | 2.266 | |
| 5 | HDPE | 160 | 0.6 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 386 |