Scheme ID: 20008666 Name of Scheme: Ranev Karamjeet No. of Villages: 8 No. of Habitation Covered: 12
Total Population Covered: 4237 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Jul-2023 Actual Date of Completion (Capex): 01-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 14.996
2 HDPE PN-6 75 2.295
3 HDPE PN-6 90 0.982
4 HDPE PN-6 110 1.664
5 HDPE PN-6 140 1.09
6 HDPE PN-6 160 0.390
7 HDPE PN-6 200 0.089
HSC Connection
Sno. Total Nos.
Other Details
309.84
340.84
298.78
17-Feb-2026
01-Jun-2026