Project Completion Certificate (Ground Water)
Scheme ID: 20008850 Name of Scheme: Arusa Azampur No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2787 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Jul-2023 Actual Date of Completion (Capex): 20-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.2 /61.21 Arusa Azampur 26.4853837 82.78871305
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 600 LPM Arusa Azampur 26.4853837 82.78871305
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 14 mtr Arusa Azampur 26.4853837 82.78871305
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 150 20
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 5.589
2 HDPE PN-6 75 0.679
3 HDPE PN-6 90 0.997
4 HDPE PN-6 110 0.201
5 HDPE PN-6 140 0.45
6 HDPE PN-6 160 0.681
HSC Connection
Sno. Total Nos.
1 346
Other Details
2.05
2.56
1.98
20-Nov-2025
20-Dec-2025