Project Completion Certificate (Ground Water)
Scheme ID: 20010906 Name of Scheme: ARNAWALI No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3801 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 11-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 34.96 Mtr / 101.86 Mtr ARNAWALI 29.022055 77.608525
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 800 LPM / 48 Mtr ARNAWALI 29.022055 77.608525
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 Kl / 12 M ARNAWALI 29.022055 77.608525
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0312
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.602
2 HDPE 90 1.218
3 HDPE 110 0.220
4 HDPE 125 1.613
5 HDPE 140 0.429
HSC Connection
Sno. Total Nos.
1 708
Other Details
3.67
3.67
2.74
07-May-2025
15-Jan-2026