Project Completion Certificate (Ground Water)
Scheme ID: 20011424 Name of Scheme: BARUASARSAND No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4270 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 10-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33 M/ 113 M BARUASARSAND 27.201963 80.333559
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.970 M³ per Min /45Mtr BARUASARSAND 27.201963 80.333559
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL/ 16 Mtr BARUASARSAND 27.201857 80.333521
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02398
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.1881
2 HDPE Pipe PN-6, Class PE-100 75 4.0193
3 HDPE Pipe PN-6, Class PE-100 90 3.0344
4 HDPE Pipe PN-6, Class PE-100 110 2.0644
5 HDPE Pipe PN-6, Class PE-100 125 1.404
6 HDPE Pipe PN-6, Class PE-100 140 0.939
7 HDPE Pipe PN-6, Class PE-100 160 0.394
8 HDPE Pipe PN-6, Class PE-100 200 0.035
HSC Connection
Sno. Total Nos.
1 584
Other Details
3.41
0.00
3.34
09-Jan-2024
24-Dec-2024