| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20011515 | Name of Scheme: PARSAI | No. of Villages: 1 | No. of Habitation Covered: 15 |
| Total Population Covered: 4780 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Jan-2022 | Actual Date of Completion (Capex): 01-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 34.92/106.38 | PARSAI | 27.65601 | 80.092008 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 1100/45 | PARSAI | 27.65601 | 80.092008 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300/16 | PARSAI | 27.65601 | 80.092008 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 200 | 20.5 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.902 | |
| 2 | HDPE | 75 | 7.672 | |
| 3 | HDPE | 90 | 4.606 | |
| 4 | HDPE | 110 | 2.149 | |
| 5 | HDPE | 125 | 1.324 | |
| 6 | HDPE | 140 | 2254 | |
| 7 | HDPE | 160 | 0.45 | |
| 8 | HDPE | 200 | 0.003 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 880 |