Project Completion Certificate (Ground Water)
Scheme ID: 20011608 Name of Scheme: BETUA URF CHANAU No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-May-2023 Actual Date of Completion (Capex): 31-Oct-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/156.04 Betua Urf Chanau 26.69 83.34
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 48/43 Betua Urf Chanau 26.69 83.34
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 22/16 Betua Urf Chanau 26.69 83.34
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.03 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.78 Laying Completed
2 HDPE 75 0.14 Laying Completed
3 HDPE 90 0.03 Laying Completed
4 HDPE 110 0.83 Laying Completed
5 HDPE 140 0.19 Laying Completed
6 HDPE 160 0.8 Laying Completed
7 HDPE 200 0.3 Laying Completed
HSC Connection
Sno. Total Nos.
1 615
Other Details
2.60
0.00
2.60
14-Jul-2026
01-Nov-2026