| Scheme ID: 20011661 | Name of Scheme: AMKOL | No. of Villages: 1 | No. of Habitation Covered: 8 |
| Total Population Covered: 2540 | Base Year: 0 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Aug-2023 | Actual Date of Completion (Capex): 05-Apr-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.13/94.91 | Amkol | 26.6936 | 83.5526 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 33/41 | Amkol | 26.6936 | 83.5526 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank-1 | 175/12 | Amkol | 26.6936 | 83.5526 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.022 | Laying Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.204 | Laying Completed |
| 2 | HDPE | 75 | 2.208 | Laying Completed |
| 3 | HDPE | 90 | 1.241 | Laying Completed |
| 4 | HDPE | 140 | 0.418 | Laying Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 457 |