Project Completion Certificate (Ground Water)
Scheme ID: 20011773 Name of Scheme: Berkhera Village Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3376 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Feb-2024 Actual Date of Completion (Capex): 12-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 49.78 MTR/101 MTR Berkhera 29.158437 78.172653
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 12.50 HP 500 LMP Berkhera 29.158437 78.172653
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL/14 MTR Berkhera 29.154171 78.173009
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PIPE PN-6:CLASS PE -100 125 0389
2 HDPE-PIPE PN-6:CLASS PE -100 160 0.389
3 HDPE-PIPE PN-6:CLASS PE -100 140 0.036
4 HDPE-PIPE PN-6:CLASS PE -100 110 0.814
5 HDPE-PIPE PN-6:CLASS PE -100 90 0.774
6 HDPE-PIPE PN-6:CLASS PE -100 75 0.388
7 HDPE-PIPE PN-6:CLASS PE -100 63 4.432
HSC Connection
Sno. Total Nos.
1 407
Other Details
1.77
1.77
1.77
10-Jun-2024
11-Jun-2024