Project Completion Certificate (Ground Water)
Scheme ID: 20011929 Name of Scheme: KASIMPURJIGINI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1530 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Jun-2023 Actual Date of Completion (Capex): 01-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12.03/96.22 Kasimpur Jigni 26.6038 83.1710
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 21/39 Kasimpur Jigni 26.6038 83.1710
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/12 Kasimpur Jigni 26.6038 83.1710
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.03 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.13 Laying Completed
2 HDPE 75 0.38 Laying Completed
3 HDPE 90 0.02 Laying Completed
HSC Connection
Sno. Total Nos.
Other Details
1.34
0.00
1.46
30-Apr-2026
25-Jun-2026